ISTQB Dumps:
Q. 1: Error guessing is:
A. An appropriate way of deriving
system tests.
B. Only used if good requirements
are not available.
C. Only used when good requirements
are available.
D. The most appropriate way of
deriving system tests.
Q. 2: Amount of testing performed
will not depend on
A. Risks involved
B. Contractual requirements
C. Legal requirements
D. Test data.
Q. 3: For software to be reliable it
must:
A. Be easy to maintain.
B. Be unlikely to cause a failure.
C. Never fail under any
circumstances.
D. Be written according to coding
standards
Q. 4: Faults found by users are due
to:
A. Poor quality software
B. Poor software and poor testing
C. Bad luck
D. Insufficient time for testing
Q. 5: An incident logging system
A. Only records defects
B. Is of limited value
C. Is a valuable source of project
information during testing if it contains all incidents
D. Should be used only by the test
team.
Q. 6: In which order should tests be
run?
A. The most important tests first
B. The most difficult tests first(to
allow maximum time for fixing)
C. The easiest tests first (to give
initial confidence)
D. The order they are thought of
Q. 7: A program validates a numeric
field as follows:
Values less than 10 are rejected,
values between 10 and 21 are accepted, values greater than or equal to 22 are
rejected. Which of the following covers the MOST b
oundary values?
A. 9,10,11,22
B. 9,10,21,22
C. 10,11,21,22
D. 10,11,20,21
Q. 8: Which of the following is not
the integration strategy?
A. Design based
B. Big-bang
C. Bottom-up
D. Top-down
Q. 9: Which of the following tools
would you use to detect a memory leak?
A. State analysis
B. Coverage analysis
C. Dynamic analysis
D. Memory analysis
Q. 10: Which of the following
statements are true?
A. Faults in program specifications
are the most expensive to fix.
B. Faults in code are the most
expensive to fix.
C. Faults in requirements are the
most expensive to fix
D. Faults in designs are the most
expensive to fix.
Q. 11: Increasing the quality of the
software, by better development methods, will
affect the time needed for testing
(the test phases) by:
A. Reducing test time
B. No change
C. Increasing test time
D. Can’t say
Q. 12: Which of the following is a
black box design technique?
A. Statement testing
B. Equivalence partitioning
C. Error-guessing
D. Usability testing
Q. 13: When reporting faults found
to developers, testers should be:
A. As polite, constructive and
helpful as possible
B. Firm about insisting that a bug
is not a "feature" if it should be fixed
C. Diplomatic, sensitive to the way
they may react to criticism
D. All of the above
Q. 14: Which of the following
statements is not true
A. Performance testing can be done
during unit testing as well as during the testing of whole system
B. The acceptance test does not
necessarily include a regression test
C. Verification activities should not
involve testers (reviews, inspections etc)
D. Test environments should be as
similar to production environments as possible
Q. 15: What is the important
criterion in deciding what testing technique to use?
A. How well you know a particular
technique
B. The objective of the test
C. How appropriate the technique is
for testing the application
D. Whether there is a tool to
support the technique
These are few of the Important ISTQB Dumps and ISTQB material for ISTQB preparation. Stay tuned for more ISTQB mock.
These are few of the Important ISTQB Dumps and ISTQB material for ISTQB preparation. Stay tuned for more ISTQB mock.
0 comments: